Enhancing Efficiency: Electrical Upgrades at Creve Coeur Airport Hanger

Portfolio

Enhancing Efficiency: Electrical Upgrades at Creve Coeur Airport Hanger

Enhancing Efficiency: Electrical Upgrades at Creve Coeur Airport Hanger
Client
Creve Coeur Airport–St. Louis, MO
Project Type
Commercial
Services
Safety, Energy Efficiency, Fan Installations

Project Overview

Brda Electric partnered with Creve Coeur Airport to upgrade their electrical infrastructure to support both operational needs and energy efficiency. This project included replacing outdated lighting with LED high bay lights, adding dedicated circuits for critical equipment, and improving general usability with receptacle upgrades and ceiling fan installations. These upgrades not only enhanced safety and comfort but also aligned with the airport’s long-term efficiency goals.

Installation included:

  • Installation of a 60A fused disconnect and a 120/240V main lug panel for reliable power distribution.
  • Replacement of existing high bay lights with six energy-efficient LED fixtures.
  • Wiring and installation of customer-supplied ceiling fans and a dedicated switch.
  • Enhanced electrical capacity with additional and upgraded receptacles.
  • Dedicated circuits for a propane heater and garage door opener.

Key Results

Creve Coeur Airport now benefits from a modernized electrical system that supports their operational demands and reduces energy consumption, ensuring long-term reliability and safety.


Request a Custom Quote

Start planning for your project right away. Contact our team today for a fast and accurate estimate.

Get a fast estimate

WE’D LOVE TO CONNECT WITH YOU!

Get $50 OFF YOUR NEXT SERVICE

MENTION CODE SAVE50

CONTACT US NOW AND CLAIM YOUR EXCLUSIVE $50 DISCOUNT!

Get a fast estimate